Artist's impressions from the developer — not photographs of the completed development.
The specification, drawn.
Drawn from this listing’s figures, at true height against a 40 ft container at the door.
40 ft container5.8 mAdjoining unit
5.8 m
9.8 kN/m²
150 Amps
Drawn as one of a semi-D pair: 3 Storey · Semi D-A, 3-storey office, 5.8 m clear height, about 21.3 m frontage. Heights are to the same scale as the 40 ft container (rear view) at the door. Indicative elevation, not a survey; legend figures are project-wide.
Marks it on the drawing
Project-wide
What’s availableSemi-D Factory
Land titleMaster Title
Site area75 acres
CompletionExpected completion 2029 Q3
Why this development
KEY DIFFERENTIATORS
75 acres
Phase 1 - 60 units (70 x 150)
Phase 2 - 31 units
Phase 3 - 78 units
Solar PV system
EV charging provision
Rainwater harvesting
GreenRE certified
Surrounded by mature amenities and townships; next to an established industrial park
Near a Google data centre and the Puncak Alam ECRL station (cargo and passenger)
Main roller shutter 6,240mm x 4,600mm; side roller shutter 3,500mm x 4,600mm
Lift provision
Surrounding population of about 150,000
SUITABLE FOR
ManufacturingLight to medium industry
Assembly OperationsProduction and assembly lines
E-commerce FulfilmentStorage and order fulfilment
Selected layout
Specifications
1 layout at this development. Prices shown are nett of the current package.